Going up instead of out. If you live in Brick, you’ve probably thought about it. Lots are tight, the yard’s already small, and the kids are getting too big to share a room. A second story looks like the answer.
It can be. But it’s a bigger job than most people picture. The roof comes off. The house below has to carry a whole new floor. And if you’re in a flood zone, the rules can change on you halfway through planning.
So before you hire anyone, check five things. Is the contractor registered with the state? Will a licensed engineer look at whether your foundation and framing can take the extra weight?
Has zoning been checked for height and setbacks? What does the flood zone mean for your house? And who’s actually pulling the permits and handling the plans?
The checklist

Are you looking to add a second story?
| Check this | Why |
| NJ contractor registration | Unregistered contractors can’t get permits |
| Engineers look at the structure | The house below has to carry a new floor |
| Zoning (height, setbacks) | Approval comes before plan review |
| Flood zone status | A big addition can trigger current flood rules |
| Who handles plans and permits | Sealed plans are required for the application |
| Written contract and change orders | Required, and it protects you |
Start with registration
Easy one. In New Jersey, home improvement contractors have to register with the state. Ask for the registration number. It has to show up on contracts, ads and the contractor’s trucks.
We’re registered as both a New Jersey Home Improvement Contractor and a New Home Builder, and we’re licensed, insured and bonded. Any contractor you talk to should be able to say the same without hesitating.
Can your house even hold a second floor?
This is the big one. Your first floor was built to hold up a roof, not a whole new level with bedrooms, a bathroom and furniture. Sometimes the existing foundation and walls can take it. Sometimes they need work first.
You don’t find that out by eyeballing it. A construction permit application in New Jersey needs engineering plans with the seal and signature of a licensed engineer or a registered architect. So someone qualified is going to look at the structure either way. The question is whether that happens before you sign or after.
Ask any contractor how they handle it. Our team includes architects and engineers, so the people drawing the plans and the people building them talk to each other. Fewer handoffs. Fewer surprises.
Check zoning before you fall in love with a design
Zoning sets how tall your house can be and how close it can sit to the property lines. A second story pushes the height up, so it matters.
On an owner-occupied home, zoning approval has to come through before plan review can even start. A good contractor checks this early. If your dream design doesn’t fit the zoning, you want to know before you’ve paid for full drawings.
The flood zone question
Parts of Brick sit in flood zones. If yours does, that can change the whole project.
Under the National Flood Insurance Program, a “substantial improvement” is work that adds up to 50% or more of the building’s market value, and additions count. Hit that line and the whole house may have to meet current floodplain standards. That can mean raising it. Some towns set the bar lower than 50%.
A second story on a smaller Shore house can get close to that line fast. Find out where you stand before you plan anything. If raising the house turns out to be part of the job, we do that too. See House Lifting & Raising.
Who handles permits?
Ask directly. Some contractors leave it to you.
We submit every permit application ourselves. Plans get finished and prior approvals like zoning get sorted before the application goes in. The township has 20 business days to approve or deny a complete application. Revised plans get an answer within 7 business days. Then come inspections throughout the build, and an addition can’t be lived in until the town issues a certificate of occupancy.
Our post Do You Need Permits for a Home Addition in New Jersey? What Homeowners Should Expect walks through each step.
Get it all in writing
New Jersey requires home improvement contracts to be in writing, with the contractor’s registration number, start and completion dates and a description of the work. And when something changes mid-build, and something always does, it should go on a written change order with the scope spelled out. That’s how we do it.
Where will you live?
People forget this part. With the roof open, a lot of families stay somewhere else for part of the job. Ask the contractor how long that stretch usually lasts and how they protect the house from weather while it’s open. And if you’re starting to wonder whether a full rebuild makes more sense, read Renovate or Rebuild? How NJ Homeowners Decide Between Major Renovation and New Construction.
Frequently asked questions
Can my house support a second story?
Maybe. A licensed engineer or registered architect has to prepare sealed plans for the permit, and the existing foundation and framing get evaluated as part of that.
Do I need zoning approval for a second-story addition in NJ?
On an owner-occupied home, zoning approval has to come through before plan review can move forward.
Does a second story affect flood zone rules?
It can. If the work reaches 50% of the building’s market value, the whole house may need to meet current floodplain standards.
How do I check if a contractor is registered in NJ?
Ask for their registration number. It has to appear on contracts, ads and vehicles, and you can confirm it with the NJ Division of Consumer Affairs.